|
| |
|
SMEC's origins were in
the development of the Snowy Mountains Hydro-electric Scheme in south eastern Australia
which was designed and built between 1949 and 1974. At the time it was
the largest infrastructure development ever undertaken in Australia and a symbol
of national development and modernisation. SMEC continues to be one of the world's
foremost hydropower development consultants. We offer over 40 years
hydropower experience in Australia, Asia, Africa and the Pacific. We have
engineered more than 30 major hydro-electric power/pumping stations of up to
2100 MW capacity.
|
|
The services
we offer our clients include:
|
|
|
These
services are available for all stages of hydropower development
including:
-
conceptual
and feasibility studies
-
design
and documentation
-
detailed
planning, programming and estimating
-
tendering
and award of contract
-
contract
administration, quality assurance and construction supervision
-
operation
and maintenance
|
 |
| |
|